Secured Trading Service

Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment

  • Audited Supplier
  • 14 yrs

Contact Supplier

Product Highlights

  • High Wear Resistance Material: Made of Cast Steel with Mn13Cr2/Mn18Cr2/Mn22Cr2/Cr26 options for superior durability.
  • Customizable Color Options: Available in Red, Blue, Black, and other colors according to customer requirements.
  • OEM/ODM Manufacturing: Manufacturer providing full customization from samples, designs, or minor adjustments.
  • Stable Quality & Reputation: 6 years of export experience to North America with high customer satisfaction feedback.
  • Wide Compatibility: Matches most Chinese brand crushers and international famous crusher brands.
  • CE & ISO Certified: Products certified with CE, ISO 9001:2000, and ISO 9001:2008 standards.
  • 1 Year Warranty: Comprehensive 1-year warranty coverage for all metal shredder crusher hammers.
  • Fast Delivery Time: Standard delivery within 35 days; 20GP container shipment within 40 days.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment

Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment pictures & photos
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment pictures & photos
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment pictures & photos
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment pictures & photos
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment pictures & photos
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment pictures & photos
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
  • Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
  • Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
    Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
  • Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
    Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
  • Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
    Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
  • Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
    Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
  • Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
    Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
  • Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
    Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment

Find Similar Products

Product Description

Metal Shredder Crusher Hammer Concrete Metal Recycling Equipment
 

Shredder Hammer is one of the most important wear parts in metal shredder crushing plant, which make sure the better performance for shredder very much. How to choose a better supplier for metal shredder wear parts and scrap shredder wear parts is very important to whom use shredder. DENP Industrial focus on stable quality metal shredder wear parts and scrap shredder wear parts in high level and get very good reputation from our customers feedback.

As the mainly crushing unit in metal shredder crushing plant, metal shredder and scrap shredder is one of most popular crusher unit in the whole shredder crushing plant. DENP Industrial focus on metal shredder wear parts and scrap shredder wear parts and prepared many shredder hammer, metal shredder top grid, scrap shredder wear parts, scrap shredder anvil, shredder pin protector, metal shredder wear parts, metal shredder grate in stock for our customers choose.

We are expert for metal shredder wear parts and scrap shredder wear parts in the past 6 years producing experience export to North America. And our Metal shredder and scrap shredder wear parts match most of Chinese brand crushers. Also, we are mainly match the metal shredder wear parts for International famous crusher brand. 

You welcome to visit us choose your ideal wear parts for your crushers.

 
Casting Material Details
 
Material C Mn Si Cr Mo Ni P S
Mn13Cr2 1.0~1.3 11~14 0.3~0.6 1.7~2.4 0.1~1.0 ≤0.03 ≤0.05 ≤0.03
Mn18Cr2 1.1~1.4 17~20 0.3~0.6 1.7~2.4 0.1~1.0 ≤0.03 ≤0.05 ≤0.03
Mn22Cr2 1.1~1.4 20~24 0.3~0.6 1.7~2.4 0.1~1.0 ≤0.03 ≤0.05 ≤0.03
Cr26 2.3~3.3 ≤1.0 ≤1.2 23~30 0.1~3.0 0.1~1.0 ≤0.06 ≤0.04
Product Photos

 

Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
FAQ

Is your company an OEM factory or a trading company?

We are the manufacturer of wear parts for crushers, providing wear-resistant parts to many well-known enterprises at home and abroad. You are more than welcome to visit our factory, we will become your excellent supplier.

 

Quality?

Stable high-end products with highest possible wear life and strong mechanical reliability. DENP brand parts are top quality products.

 

Shipment?

Try to ensure delivery a 20GP within 40 days. If the order is particularly urgent, it depends on the production plan at the time.

 

Payment?

30% T/T advanced and the balance of 70% T/T before shipping.

 

How much is the remaining capacity of your plant?

We are working hard to increase the actual production capacity to reach the theoretical capacity target of 10,000 tons per year. On the other hand, we are adjusting the production plan to try to meet the demand for quality distributors like you.

 

Why do you use a fine sand recycling system in your factory? How is your surface treated to ensure a good appearance?

The fine sand recycling system ensures that we always use the highest quality fine sand and combined with two-shot blasting treatments to minimize appearance defects and give our customers a better sensory experience.

 

Is it difficult to produce small items (products below 100kg) and is the delivery period long?

Our main products are 200kg-6000kg. The cost of casting small parts is high, and small parts are generally used to help customers put together a whole container. Since there is no special equipment for small parts, they needs to be put together according to the production plan of other products, so the production cycle will be a bit longer.

 

Please inform the nearest airport or train station from your factory.

Airport: YIWU AIRPORT(45 minutes by car); Train station: JINHUA RAILWAY STATION (25 minutes by car)

 
Company Profile

Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment
Metal Shredder Crusher Hammer Used for Concrete Metal Recycling EquipmentMetal Shredder Crusher Hammer Used for Concrete Metal Recycling Equipment

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR242146". Items marked "verified" are certified.

Watch Video
Watch Video
Shenzhen DENP Industrial Co., Ltd.
Shenzhen DENP Industrial Co., Ltd.
Shenzhen DENP Industrial Co., Ltd.
Shenzhen DENP Industrial Co., Ltd.
Shenzhen DENP Industrial Co., Ltd.
Shenzhen DENP Industrial Co., Ltd.
Shenzhen DENP Industrial Co., Ltd.
Shenzhen DENP Industrial Co., Ltd.

About Our Factory & Business Background

Address
5 Floor, No.2000 Pudong Avenue, Shanghai, China
Terms of Payment
LC, T/T, D/P, Western Union
International Commercial Terms(Incoterms)
FOB, CIF, EXW
Average Lead Time
Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Nearest Port
Shanghai, Ningbo

Our Production Capability & Technical Expertise

Main Products
Stone Crusher, Jaw Crusher Parts, Cone Crusher, Impact Crusher, Jaw Crusher, Impact Crusher Parts, Mining Equipment, Cone Crusher Parts, Jaw Plate, Toggle Plate
verified Customization Options
Customization from Samples, Customization from Designs, Full Customization, Minor Customization, Flexible customization
verified ODM Service Available
Yes
verified OEM Service Available
Yes

Our Industry Experience & Global Business Record

Export Year
2010-09-28
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
verified Repeat Buyers Choice
80%~100%

FAQ

Is your company an OEM factory or a trading company?
We are the manufacturer of wear parts for crushers, providing wear-resistant parts to many well-known enterprises at home and abroad. You are more than welcome to visit our factory, we will become your excellent supplier.
What is the quality of your products?
Stable high-end products with highest possible wear life and strong mechanical reliability. DENP brand parts are top quality products.
What is the shipment and delivery time?
Try to ensure delivery a 20GP within 40 days. If the order is particularly urgent, it depends on the production plan at the time.
What are the payment terms?
30% T/T advanced and the balance of 70% T/T before shipping.
How much is the remaining capacity of your plant?
We are working hard to increase the actual production capacity to reach the theoretical capacity target of 10,000 tons per year. On the other hand, we are adjusting the production plan to try to meet the demand for quality distributors like you.
Why do you use a fine sand recycling system and how is the surface treated?
The fine sand recycling system ensures that we always use the highest quality fine sand and combined with two-shot blasting treatments to minimize appearance defects and give our customers a better sensory experience.
Is it difficult to produce small items and is the delivery period long?
Our main products are 200kg-6000kg. The cost of casting small parts is high, and small parts are generally used to help customers put together a whole container. Since there is no special equipment for small parts, they needs to be put together according to the production plan of other products, so the production cycle will be a bit longer.
What is the nearest airport or train station from your factory?
Airport: YIWU AIRPORT(45 minutes by car); Train station: JINHUA RAILWAY STATION (25 minutes by car)

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now